Header height

Rig Inspection Services – DROPS Survey

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Asset Type

Name of Asset

Location of Asset

Address of Location

(Please Provide Google Map Link To Be Precise)

Please Provide Google Map Link of The Above Address. This Helps Us to Pin Point a More Precise Location.

Inspection Method

Application Standard for Testing

Applicable Standard for DROPS Survey

Applicable Standard for Derrick Inspection

Applicable Standard for 25% Derrick Bolt Check

Manpower Requirement

*Standard team composition and estimated no of working for each work scope
i. 6 Monthly LGI – 3 Pax (Lead, NDT Tech & IRATA L3), 14 days
ii. 6 Monthly LGI & Annual NDT – 3 Pax (Lead, NDT Tech & IRATA L3), 21 days

No of working day may affected by weather, availability of equipment, accessibility to equipment, etc.

No of Pax Required

No of Pax Required

No of Pax Required

No of Pax Required

No of Pax Required

No of Pax Required

Rope Access Required to Carry Out This Job?

Rope Access Supervisor (IRATA Level 3) Provided by The Client?

Is There a List of Items to Be Tested?

Please Upload File Containing The List of Items

Drag & drop a file here or browse
Max size 10MB

Are The Certificate of Conformance (CoC), Mill Certificate, Previous Test/ Inspection/ Calibration Certificate Available?

Please Upload The Certificates

Drag & drop a file here or browse
Max size 10MB

Commencement Date

* Subject to resources and availability.

Additional Requirement

Any special entry/country/local permits, qualifications required?

Please specify the special entry/country/local permits, qualifications that are required.